Ads
related to: belvi travel novi sad beograd polasci 2 3 2022
Search results
Results From The WOW.Com Content Network
3: Belgrade – Mala Krsna – Velika Plana: 102 km 1 yes 4: Belgrade – Novi Sad – Border with Hungary near Subotica: 183 km 2 yes High-speed (200 km/h) rail is opened between Belgrade and Novi Sad since 19 March 2022. Double tracking and upgrade to high-speed of 200 km/h is currently in progress from Novi Sad to Subotica (border with ...
The 75 km railway for speed up to 200 km/h between Belgrade and Novi Sad, along with a reconstructed railways station building was opened on 19 March 2022 [3] [16] [14] (this part was divided in two sections: as of 2018, the Belgrade–Stara Pazova 34.5 km section was planned to be finished in the end of 2020 and the Stara Pazova–Novi Sad 40. ...
The hotel and catering sector accounted for approximately 2.2% of GDP in 2015. [2] Tourism in Serbia employs some 120 000 people, about 4.5% of the country's workforce. [1] In recent years the number of tourists is increasing. In 2019, tourism generated an income of nearly $1.698 billion, hosting 1.85 million tourists.
As part of the 2017–2022 construction of the Belgrade–Novi Sad high-speed railway, the station was partially upgraded and reconstructed, including works on the canopy, staircase, plateau, and the addition of a ticket booth and six elevators. The works were to be finished on 28 May 2023, but they extended.
The 75 km railway for speed up to 200 km/h between Belgrade and Novi Sad opened on 19 March 2022 (this part was divided in two sections: as of 2018, the Belgrade–Stara Pazova 34.5 km section was planned to be finished in the end of 2020 and the Stara Pazova–Novi Sad 40.4 km section in November 2021).
The Serbian government declared a nation-wide day of mourning for 2 November, [1] while the Autonomous Province of Vojvodina and the City of Novi Sad declared three days of mourning in the city. [37] [38] Citizens lit candles and laid flowers at Freedom Square and in front of the railway station. [39] [40]