When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Geometric design of roads - Wikipedia

    en.wikipedia.org/wiki/Geometric_design_of_roads

    In areas that receive significant snow and ice, most agencies use a maximum cross slope of 6 to 8%. While steeper cross slope makes it difficult to traverse the slope at low speed when the surface is icy, and when accelerating from zero with warm tyres on the ice, lower cross slope increases the risk of loss-of-control at high speeds ...

  3. Cross slope - Wikipedia

    en.wikipedia.org/wiki/Cross_slope

    Cross slope, cross fall or camber is a geometric feature of pavement surfaces: the transverse slope with respect to the horizon. It is a very important safety factor. Cross slope is provided to provide a drainage gradient so that water will run off the surface to a drainage system such as a street gutter or ditch.

  4. Interstate Highway standards - Wikipedia

    en.wikipedia.org/wiki/Interstate_Highway_standards

    Pavement sloping: On straight sections of the highway, the roadway is to have a cross slope of at least 1.5%, and preferably 2% to ensure proper drainage, with up to 2.5% in areas of heavy rainfall. The cross slope of both the left and right shoulders should be between 2% and 6%, but not less than the main lanes.

  5. Cant (road and rail) - Wikipedia

    en.wikipedia.org/wiki/Cant_(road_and_rail)

    In civil engineering, cant is often referred to as cross slope or camber. It helps rainwater drain from the road surface. Along straight or gently curved sections, the middle of the road is normally higher than the edges. This is called "normal crown" and helps shed rainwater off the sides of the road. During road works that involve lengths of ...

  6. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    Slope may still be expressed when the horizontal run is not known: the rise can be divided by the hypotenuse (the slope length). This is not the usual way to specify slope; this nonstandard expression follows the sine function rather than the tangent function, so it calls a 45 degree slope a 71 percent grade instead of a 100 percent. But in ...

  7. Drainage gradient - Wikipedia

    en.wikipedia.org/wiki/Drainage_gradient

    Typically on straight road sections, the drainage gradient is at least 1–3% due to the normal cross slope of 1–3%. In curved sections the drainage gradient is higher, and may often reach 5–12% due to superelevated CS that may reach 5–8% in areas with icy roads and up to 12% in areas without icy roads.

  8. Controlled-access highway - Wikipedia

    en.wikipedia.org/wiki/Controlled-access_highway

    Maximum longitudinal gradients typically not exceeding 4% to 5%. Cross sections incorporating a minimum of two through-traffic lanes for each direction of travel, with a typical width of 3.50 to 3.75 m (11 ft 6 in to 12 ft 4 in) each, separated by a central median.

  9. List of gaps in Interstate Highways - Wikipedia

    en.wikipedia.org/wiki/List_of_gaps_in_Interstate...

    This section of highway was for many years marked as US 3 and "To I-93", but these have now been replaced with regular I-93 signs. The Federal Highway Act of 1973 exempts this 7.6-mile (12.2 km) stretch from the Interstate Highway standards that apply elsewhere, and this highway is considered to be I-93 for all practical purposes. [19]