When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  3. Diversity factor - Wikipedia

    en.wikipedia.org/wiki/Diversity_factor

    The diversified load is the total expected power, or "load", to be drawn during a peak period by a device or system of devices. The maximum system load is the combination of each device's full load capacity, utilization factor, diversity factor, demand factor, and the load factor. This process is referred to as load diversification.

  4. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw (which we call full load). For example, an oversized motor - 15 kW - drives a constant 12 kW load whenever it is on. The motor load factor is then 12/15 = 80%.

  5. Load-loss factor - Wikipedia

    en.wikipedia.org/wiki/Load-loss_factor

    Since the losses in the wires are proportional to the square of the current (and thus the square of the power), the LLF can be calculated by measuring the square of delivered power over a short interval of time (typically half an hour), calculating an average of these values over a long period (a year), and dividing by the square of the peak ...

  6. Load profile - Wikipedia

    en.wikipedia.org/wiki/Load_Profile

    In a power system, a load curve or load profile is a chart illustrating the variation in demand/electrical load over a specific time. Generation companies use this information to plan how much power they will need to generate at any given time. A load duration curve is similar to a load curve. The information is the same but is presented in a ...

  7. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    If a plant is only needed during the day, for example, even if it operates at full power output from 8 am to 8 pm every day (12 hours) all year long, it would only have a 50% capacity factor. Due to low capacity factors, electricity from peaking power plants is relatively expensive because the limited generation has to cover the plant fixed costs.

  8. Load balancing (electrical power) - Wikipedia

    en.wikipedia.org/wiki/Load_balancing_(electrical...

    The cost for such power is less than the "on-demand" power which makes it worthwhile for the user to subscribe to it. A nuanced system is possible with benefits for the power company and the electricity user. Once home devices contain the appropriate electronics, it will no longer be necessary to have devices connected to a special circuit.

  9. Electricity meter - Wikipedia

    en.wikipedia.org/wiki/Electricity_meter

    North American domestic analog (Ferraris disk) electricity meter. Electricity meter with transparent plastic case (Israel) An electricity meter, electric meter, electrical meter, energy meter, or kilowatt-hour meter is a device that measures the amount of electric energy consumed by a residence, a business, or an electrically powered device over a time interval.