When.com Web Search

  1. Ads

    related to: power factor adjustment unit for generator panel for sale

Search results

  1. Results From The WOW.Com Content Network
  2. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A resistive/reactive inductive and/or capacitive load is often required to test solar inverters to ensure solar panels can be stopped from producing electricity in the event of a power outage. The resistive/reactive combination load banks are used to test the engine generator set at its rated power factor. In most cases this is 0.8 power factor ...

  3. Automatic generation control - Wikipedia

    en.wikipedia.org/wiki/Automatic_generation_control

    An electrical grid may have many types of generators and loads; generators must be controlled to maintain stable operation of the system. In an electric power system, automatic generation control (AGC) is a system for adjusting the power output of multiple generators at different power plants, in response to changes in the load. Since a power ...

  4. Droop speed control - Wikipedia

    en.wikipedia.org/wiki/Droop_speed_control

    Adjustments in power output for a particular primer mover and generator combination are made by slowly raising the droop curve by increasing the spring pressure on a centrifugal governor or by an engine control unit adjustment, or the analogous operation for an electronic speed governor. All units to be connected to a grid should have the same ...

  5. Load management - Wikipedia

    en.wikipedia.org/wiki/Load_management

    Capacity factor is a measure of the output of a power plant compared to the maximum output it could produce. Capacity factor is often defined as the ratio of average load to capacity or the ratio of average load to peak load in a period of time. A higher load factor is advantageous because a power plant may be less efficient at low load factors ...

  6. Dispatchable generation - Wikipedia

    en.wikipedia.org/wiki/Dispatchable_generation

    Hydroelectric power plants can often dispatch in tens of seconds to minutes, and natural gas power plants can generally dispatch in tens of minutes. For example, the 1,728 MW Dinorwig pumped storage power plant can reach full output in 16 seconds. [4] Gas turbine (Brayton cycle) thermal plants require around 15-30 minutes to startup.

  7. Power factor - Wikipedia

    en.wikipedia.org/wiki/Power_factor

    The power factor in a single-phase circuit (or balanced three-phase circuit) can be measured with the wattmeter-ammeter-voltmeter method, where the power in watts is divided by the product of measured voltage and current. The power factor of a balanced polyphase circuit is the same as that of any phase. The power factor of an unbalanced ...