Ads
related to: rainproof concrete after pouring floor plan free- Free Kitchen Design
3D Drawing Done By One of Our
Professional Designers for Free.
- 40% off Samples
Sample First Before You Buy.
No Hassle Free Shipping Today.
- Up to 55% off Cabinetry
MLK Day Sale
The RTA Store
- Free Closet Design
Affordable, high quality, closets
designed and produced for you.
- Free Kitchen Design
Search results
Results From The WOW.Com Content Network
Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.
The precast concrete slab has tubular voids extending the full length of the slab, typically with a diameter equal to the 2/3–3/4 the thickness of the slab. This makes the slab much lighter than a massive solid concrete floor slab of equal thickness or strength. The reduced weight also lowers material and transportation costs.
In poured concrete foundations, cracks and pipe penetrations are the most common entry points for seepage. These openings can be sealed from the interior. Epoxies , which are strong adhesives, or urethanes can be pressure injected into the openings, thus penetrating the foundation through to the exterior and cutting off the path of the seepage.
The coating is applied between 1.25-1.5 lb per square yard and continues until the whole surface is covered. If the surface requires another coat, it must be applied within forty eight hours of the initial application of the hydrophobic mixture. Once applied, the concrete must cure in a moist environment two to three hours after the application.