Ads
related to: pouring concrete over existing slab to fix cracks in one yard
Search results
Results From The WOW.Com Content Network
Dowel bar retrofit (DBR) is a process that re-establishes load transfer capability on joints and cracks by installing epoxy-coated, round steel dowels into existing concrete pavement across transverse joints and/or cracks. Slots are cut using diamond-tipped saw blades; the existing concrete is removed and the dowels are placed in the slots ...
A dowel bar retrofit (DBR) is a method of reinforcing cracks in highway pavement by inserting steel dowel bars in slots cut across the cracks. It is a technique which several U.S. states' departments of transportation have successfully used in repairs to address faulting in older jointed plain concrete pavements.
In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.
Dry conducted one of the early researches using macroencapsulation, proposing polypropylene and glass fibers with a mono- or multicomponent methyl methacrylate core for healing concrete cracks. [24] The selection of the fibers was prompted by the combination of mechanical strengthening, crack sealing, and a cost-effective encapsulating technique.
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...