Search results
Results From The WOW.Com Content Network
Poles, from which these buildings get their name, are natural shaped or round wooden timbers 4 to 12 inches (100 to 300 mm) in diameter. [4] The structural frame of a pole building is made of tree trunks, utility poles, engineered lumber or chemically pressure-treated squared timbers which may be buried in the ground or anchored to a concrete slab.
Braced frame construction, also known as full frame, half frame, [6] New England braced frame, [7] combination frame, [8] is an early form of light framing developed from the heavier timber framing which preceded it. It is defined by the continued use of girts, corner posts, and braces.
Steel frame structure Rectangular steel frame, or "perimeter frame" of the Willis building (at right) contrasted against the diagrid frame at 30 St Mary Axe (at center), in London. Steel frame is a building technique with a " skeleton frame" of vertical steel columns and horizontal I-beams , constructed in a rectangular grid to support the ...
The design and use of steel frames are commonly employed in the design of steel structures. More advanced structures include steel plates and shells. In structural engineering, a structure is a body or combination of pieces of the rigid bodies in space that form a fitness system for supporting loads and resisting moments.
By 1963, a new structural system of framed tubes had appeared in skyscraper design and construction. Fazlur Rahman Khan, a structural engineer from Bangladesh (then called East Pakistan) who worked at Skidmore, Owings & Merrill, defined the framed tube structure as "a three dimensional space structure composed of three, four, or possibly more frames, braced frames, or shear walls, joined at or ...
In the U.K. a strut may be very similar to a post but not carry a beam. [8] In wood construction posts normally land on a sill, but in rare types of buildings the post may continue through to the foundation called an interrupted sill or into the ground called earthfast, post in ground, or posthole construction.
Beam soffits: 8–14 days. Beam props: 15–21 days. This consists of a vertical mold of the desired shape and size matching the column to be poured. To keep the material thickness to a minimum, horizontal steel or timber clamps (or yokes) are used for batch filling and at varying centers for filling that is completed in one pour.
The two common assumptions as to the behavior of a building frame are (1) that its beams are free to rotate at their connections or (2) that its members are so connected that the angles they make with each other do not change under load. Frameworks with connections of intermediate stiffness will be intermediate between these two extremes.