When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Capacity_utilization

    Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [ 1 ]

  3. Load duration curve - Wikipedia

    en.wikipedia.org/wiki/Load_duration_curve

    The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity factor. The product of the two is a measure of electrical energy (e.g. kilowatthours).

  4. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  5. Intersection capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Intersection_Capacity...

    The ICU method uses the Level of Service concept, in which reports on the amount of reserved capacity or capacity deficit. In order to calculate the Level of Service for the ICU method, the ICU for an intersection must be computed first. [3] ICU can be computed by: ICU = sum(max (tMin, v/si) * CL + tLi) / CL = Intersection Capacity Utilization

  6. Overall equipment effectiveness - Wikipedia

    en.wikipedia.org/wiki/Overall_equipment...

    The Standard Rate for the part being produced is 40 Units/Hour or 1.5 Minutes/Unit The Work Center produces 242 Total Units during the shift. Note: The basis is Total Units, not Good Units. The Performance metric does not penalize for Quality. Time to Produce Parts = 242 Units * 1.5 Minutes/Unit = 363 Minutes

  7. Queueing theory - Wikipedia

    en.wikipedia.org/wiki/Queueing_theory

    Given an arrival rate λ, a dropout rate σ, and a departure rate μ, length of the queue L is defined as: L = λ − σ μ {\displaystyle L={\frac {\lambda -\sigma }{\mu }}} . Assuming an exponential distribution for the rates, the waiting time W can be defined as the proportion of arrivals that are served.

  8. Growth of photovoltaics - Wikipedia

    en.wikipedia.org/wiki/Growth_of_photovoltaics

    The utilization rate is the ratio of production capacities versus actual production output for a given year. A low of 49% was reached in 2007 and reflected the peak of the silicon shortage that idled a significant share of the module production capacity. As of 2013, the utilization rate had recovered somewhat and increased to 63%. [64]: 47

  9. Channel capacity - Wikipedia

    en.wikipedia.org/wiki/Channel_capacity

    3 Shannon capacity of a graph. 4 Noisy-channel coding theorem. ... Feedback capacity is the greatest rate at which information can be reliably transmitted, ...