Ads
related to: twin pipe deep well jet assembly packerereplacementparts.com has been visited by 100K+ users in the past month
Search results
Results From The WOW.Com Content Network
Permanent packers are run and set on an electric wireline, drill pipe or tubing. Opposed slips are positioned to lock it in compression. Once set this packer is resistant to motion for either direction. Wireline uses an electric current to detonate an explosive charge to set the packer. A release stud then frees the assembly form the packer.
Tubing flow: a tubing string and a production packer are installed. The packer means that all the flow goes through the tubing. Within the tubing you can mount a combination of tools that will help to control fluid flow through the tubing. Gas lift well: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is ...
Wireline truck performing pipe recovery on location in Alberta, Canada. Pipe recovery is a specific wireline operation used in the oil and gas industry, when the drill string becomes stuck downhole. Stuck pipe prevents the drill rig from continuing operations. This results in costly downtime, ranging anywhere from $10,000-1,000,000 per day of ...
The S type pump is useful for removing water from a well or container. Shallow well pumps are those in which the jet assembly is attached directly to the main pump and are limited to a depth of approximately 5-8m to prevent cavitation. Deep well pumps are those in which the jet is located at the bottom of the well. The maximum depth for deep ...
Pipe rams close around a drill pipe, restricting flow in the annulus (ring-shaped space between concentric objects) between the outside of the drill pipe and the wellbore, but do not obstruct flow within the drill pipe. Variable-bore pipe rams can accommodate tubing in a wider range of outside diameters than standard pipe rams, but typically ...
When the well has been drilled, it is completed to provide an interface with the reservoir rock and a tubular conduit for the well fluids. The surface pressure control is provided by a Christmas tree, which is installed on top of the wellhead, with isolation valves and choke equipment to control the flow of well fluids during production.