Ad
related to: finished basement general code requirement chart
Search results
Results From The WOW.Com Content Network
The 16 Divisions of construction, as defined by the Construction Specifications Institute (CSI)'s MasterFormat, is the most widely used standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. and Canada.
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP: Division 00 — Procurement and Contracting Requirements; SPECIFICATIONS GROUP. General Requirements Subgroup. Division 01 — General Requirements; Facility Construction Subgroup. Division 02 — Existing Conditions; Division 03 — Concrete; Division 04 — Masonry; Division 05 — Metals
More recently, finished space has become increasingly acceptable as a measure which includes the developed basement areas of a home. Due to fire code requirements, most jurisdictions require an emergency egress (through either egress-style windows, or, in the case of a walk-out basement, a door) to include the basement square footage as living ...
The design begins by determining the requirements of the concrete. These requirements take into consideration the weather conditions that the concrete will be exposed to in service, and the required design strength. The compressive strength of a concrete is determined by taking standard molded, standard-cured cylinder samples.
The UBC was replaced in 2000 by the new International Building Code (IBC) published by the International Code Council (ICC). The ICC was a merger of three predecessor organizations which published three different building codes. [ 2 ]
The 1916 zoning ordinance sought to control building size by regulating height and setback requirements for towers. In 1961, a revision to the zoning ordinance introduced the concept of floor area ratio (FAR).
The ACI Building Code Requirements put the following restrictions on amount of spiral reinforcement. ACI Code 7.10.4.2: For cast-in-place construction, size of spirals shall not be less than 3/8 in. diameter. ACI Code 7.10.4.3: Clear spacing between spirals shall not exceed 3 in., nor be less than 1in.
The code book itself (2000 edition) totals over 700 pages and chapters include: Building occupancy classifications; Building heights and areas; Interior finishes; Foundation, wall, and roof construction; Fire protection systems (sprinkler system requirements and design) Materials used in construction; Elevators and escalators; Already existing ...