When.com Web Search

  1. Ads

    related to: elevated deck framing diagram
    • Framing Warranty Info

      We've got you covered with an up to

      25 year warranty for our framing.

    • Where To Buy

      Find qualified dealers, contractors

      online retailers and more.

Search results

  1. Results From The WOW.Com Content Network
  2. Domestic roof construction - Wikipedia

    en.wikipedia.org/wiki/Domestic_roof_construction

    Building codes in the U.S. specify ventilation rates as a minimum of 1 sq ft (0.093 m 2) of opening per 150 sq ft (14 m 2) (1:150) with a ratio of 1:300 in some conditions. [8] Warm air rises, so ceiling insulation is designed to have a higher r-value and the insulation is often installed between the ceiling joists or rafters.

  3. List of roof shapes - Wikipedia

    en.wikipedia.org/wiki/List_of_roof_shapes

    Monitor roof: A roof with a monitor; 'a raised structure running part or all of the way along the ridge of a double-pitched roof, with its own roof running parallel with the main roof.' Butterfly roof (V-roof, [8] London roof [9]): A V-shaped roof resembling an open book. A kink separates the roof into two parts running towards each other at an ...

  4. Deck (building) - Wikipedia

    en.wikipedia.org/wiki/Deck_(building)

    In architecture, a deck is a flat surface capable of supporting weight, similar to a floor, but typically constructed outdoors, often elevated from the ground, and usually connected to a building. The term is a generalization from the deck of a ship.

  5. Framing (construction) - Wikipedia

    en.wikipedia.org/wiki/Framing_(construction)

    Wall framing in house construction includes the vertical and horizontal members of exterior walls and interior partitions, both of bearing walls and non-bearing walls. . These stick members, referred to as studs, wall plates and lintels (sometimes called headers), serve as a nailing base for all covering material and support the upper floor platforms, which provide the lateral strength along a

  6. Rim joist - Wikipedia

    en.wikipedia.org/wiki/Rim_joist

    In the framing of a deck or floor system, a rim joist is attached perpendicular to the joists, and provides lateral support for the ends of the joists while capping off the end of the floor or deck system. Rim joists are not to be confused with end joists, which are the first and last joists at the ends of a row of joists that make up a floor ...

  7. Falsework - Wikipedia

    en.wikipedia.org/wiki/Falsework

    Falsework parallel truss bridges temporarily supporting deck segment box structures Overpass under construction over Interstate 5 in Burbank, California, in July 2021 [4] [5] Sixth Street Viaduct Falsework - Bent 11 Jump Span. Shown in the background is a concrete Y-Arm.

  1. Ad

    related to: elevated deck framing diagram