When.com Web Search

  1. Ads

    related to: sanding between deck boards and lumber posts

Search results

  1. Results From The WOW.Com Content Network
  2. Floor sanding - Wikipedia

    en.wikipedia.org/wiki/Floor_sanding

    For oak, maple, and ash hardwoods, It is recommended to start with 40 grit, then with each subsequent sanding pass, go up in sandpaper grit e.g. 60, 80, and finish with 100 grit. When wood floor planks are warped, cupped, or significantly uneven, it may require multiple passes. The differences in height between the boards are flattened uniformly.

  3. Deck railing - Wikipedia

    en.wikipedia.org/wiki/Deck_railing

    In between the posts, two 2x4s are attached to the posts with screws for the best connection. The lower board is placed 3.5" from the top of the finish deck to the bottom of the board. The top board is placed with the top at 35" from the deck. Then the vertical 2x2 pressure treated wood balusters are installed spaced regularly every 3.5". Then ...

  4. Rim joist - Wikipedia

    en.wikipedia.org/wiki/Rim_joist

    Collectively, the end joists and rim joists are called band joists, especially in regard to deck construction. In dimensioned lumber construction, the rim joists are the same depth, thickness and material as the joists themselves; in engineered wood construction, the rim joists may be oriented strand board (OSB), plywood or an engineered wood ...

  5. Wood preservation - Wikipedia

    en.wikipedia.org/wiki/Wood_preservation

    Apart from structural wood preservation measures, there are a number of different chemical preservatives and processes (also known as timber treatment, lumber treatment or pressure treatment) that can extend the life of wood, timber, and their associated products, including engineered wood. These generally increase the durability and resistance ...

  6. Butt joint - Wikipedia

    en.wikipedia.org/wiki/Butt_joint

    The cam post is screwed into a predrilled hole in the face of one piece, such that the post head and barrel section protrude. The cam lock is placed in a cylindrical well near the edge of a second piece, which has a predrilled hole extending from the side of the well to the edge of the piece.

  7. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  8. Upgrade to a faster, more secure version of a supported browser. It's free and it only takes a few moments:

  9. Shoring - Wikipedia

    en.wikipedia.org/wiki/Shoring

    This consists of a timber member jammed on a pad piece on either the deck or deck head depending on water levels in the compartment and a strong point, this is called the proud. Then there is a horizontal timber cut to size to fit between this and what it is shoring up, e.g. a splinter box, bulkhead or door.