Logging while drilling (LWD) is a technique of conveying well logging tools into the well borehole downhole as part of the bottom hole assembly (BHA).. Although the terms Measurement while drilling (MWD) and LWD are related, within the context of this section, the term MWD refers to directional-drilling measurements, e.g., for decision support for the smooth operation of the drilling, while ...
The terms measurement while drilling (MWD), and logging while drilling (LWD) are not used consistently throughout the industry. Although these terms are related, within the context of this section, the term measurement while drilling refers to directional-drilling measurements, e.g. for decision support for the wellbore path, (Inclination and ...
OCM – offshore construction manager; OCS – offshore construction supervisor; OCTG – oil country tubular goods (oil well casing, tubing, and drill pipe) [23] OD – outer diameter (of a tubular component such as casing [citation needed]) ODT – oil down to; OFE – oil field equipment; OFST – offset vertical seismic profile
Rotary assemblies [2] are commonly used where formations are predictable and the rig economics are an issue. In such an assembly the weight of the drill collars gives the BHA the tendency to sag or flex to the low side of the hole, collar stiffness length and stabiliser diameter and placement are engineered as a means of controlling the flex of the BHA.
In practice, driller's depth measurement is a manual operation, not changed significantly over the years and there are many facets of the system with potential to introduce errors and inconsistencies. This process was first described by Reistle and Sikes in 1938, [1] and has not changed significantly.
1" (5 foot average) mud log showing heavy (hydrocarbons) (large area of yellow)Mud logging includes observation and microscopic examination of drill cuttings (formation rock chips), and evaluation of gas hydrocarbon and its constituents, basic chemical and mechanical parameters of drilling fluid or drilling mud (such as chlorides and temperature), as well as compiling other information about ...
Process Equipment Subgroup: Division 40 — Process Interconnections; Division 41 — Material Processing and Handling Equipment; Division 42 — Process Heating, Cooling, and Drying Equipment; Division 43 — Process Gas and Liquid Handling, Purification and Storage Equipment; Division 44 — Pollution Control Equipment
In construction, commissioning or commissioning process (often abbreviated Cx) [1] [2] [3] is an integrated, systematic process to ensure, that all building systems perform interactively according to the "Design Intent", through documented verification. The commissioning process establishes and documents the "Owner's Project Requirements (OPR ...