Search results
Results From The WOW.Com Content Network
A rockfall protection embankment is an earthwork built in elevation with respect to the ground to intercept falling rock fragments before elements at risk such as roads and buildings are reached. This term is widely used in the rockfall community but the terms bunds and walls are sometimes used as alternatives.
The rockfall still takes place but an attempt is made to control the outcome. In contrast, active mitigation is carried out in the initiation zone and prevents the rockfall event from ever occurring. Some examples of these measures are rock bolting , slope retention systems, shotcrete , etc.
Rockfall simulators determine travel paths and trajectories of unstable blocks separated from a rock slope face. [36] Analytical solution method described by Hungr & Evans [37] assumes rock block as a point with mass and velocity moving on a ballistic trajectory with regard to potential contact with slope surface. Calculation requires two ...
A rockfall barrier is a structure built to intercept rockfall, most often made from metallic components and consisting of an interception structure hanged on post-supported cables. [ 1 ] Barriers are passive rockfall mitigation structures adapted for rock block kinetic energies up to 8 megajoules.
Talus cones produced by mass moving, north shore of Isfjord, Svalbard, Norway Mass wasting at Palo Duro Canyon, West Texas (2002) A rockfall in Grand Canyon National Park. Mass wasting, also known as mass movement, [1] is a general term for the movement of rock or soil down slopes under the force of gravity.
Drilling and blasting is the controlled use of explosives and other methods, such as gas pressure blasting pyrotechnics, to break rock for excavation. It is practiced most often in mining, quarrying and civil engineering such as dam, tunnel or road construction. The result of rock blasting is often known as a rock cut.
Geological structure measurement by LiDAR technology is a remote sensing method applied in structural geology. It enables monitoring and characterisation of rock bodies. [ 1 ] This method's typical use is to acquire high resolution structural and deformational data for identifying geological hazards risk, such as assessing rockfall risks or ...
A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...