Search results
Results From The WOW.Com Content Network
The Wood–Armer method is a structural analysis method based on finite element analysis used to design the reinforcement for concrete slabs. [1] This method provides simple equations to design a concrete slab based on the output from a finite element analysis software.
A large number of Indian Standard (IS) codes are available that are meant for virtually every aspect of civil engineering one can think of. During one's professional life one normally uses only a handful of them depending on the nature of work they are involved in. Civil engineers engaged in construction activities of large projects usually have to refer to a good number of IS codes as such ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
The overall mass of concrete can be reduced by 35–50% depending on the design, [1] as a consequence of reduced slab mass, as well as lower requirements for vertical structure and foundations. Biaxial slabs commonly span up to 20 metres at a thickness of around 500 mm. [ citation needed ] The added strength also reduces the acoustic ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The underside of a waffle slab, showing the grid like structure. A waffle slab or two-way joist slab is a concrete slab made of reinforced concrete with concrete ribs running in two directions on its underside. [1] The name waffle comes from the grid pattern created by the reinforcing ribs.
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
Slab track with flexible noise-reducing rail fixings, built by German company Max Bögl, on the Nürnberg–Ingolstadt high-speed line. A ballastless track or slab track is a type of railway track infrastructure in which the traditional elastic combination of sleepers and ballast is replaced by a rigid construction of concrete or asphalt.