Ads
related to: well head specs
Search results
Results From The WOW.Com Content Network
A wellhead is the component at the surface of an oil or gas well that provides the structural and pressure ... The oil industry specifications for wellhead systems ...
Well completion is the process of making a well ready for production (or injection) after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as required.
Blowout preventers (BOPs) (#23 and #24) are devices installed at the wellhead to prevent fluids and gases from unintentionally escaping from the wellbore. #23 is the annular (often referred to as Hydril named after a manufacturer), and #24 is the pipe rams and blind rams.
BOP stacks frequently utilize both types, typically with at least one annular BOP stacked above several ram BOPs. Blowout preventers are used on land wells, offshore rigs, and subsea wells. Land and subsea BOPs are secured to the top of the wellbore, known as the wellhead. BOPs on offshore rigs are mounted below the rig deck.
In the offshore drilling industry, the conductor pipe is set in the seabed, and is a key structural foundation for the subsea wellhead. When drilling an offshore well, a marine riser is connected to the well, and this is subjected to large environmental forces such as current and waves which are transferred to the conductor. The forces can be ...
The scale of the technology is frequently smaller than for an oil well, and can typically fit on top of an existing hand-pumped well head. The technology is simple, typically using a parallel-bar double-cam lift driven from a low-power electric motor, although the number of pumpjacks with stroke lengths 54 inches (1.4 m) and longer being used ...
Wireline-wellhead. For oilfield work, the wireline resides on the surface, wound around a large (3 to 10 feet in diameter) spool. Operators may use a portable spool (on the back of a special truck) or a permanent part of the drilling rig. A motor and drive train turn the spool and raise and lower the equipment into and out of the well – the ...
The tubing hanger attaches to the topmost tubing joint in the wellhead to support the tubing string. Hitch: Rig employees refer to their work period as a 'hitch.' A common hitch is 20 days on, followed by 10 days off. Typically, two crews will be on and each crew will spend one week working 7am-7pm and the following week 7pm-7am.