The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place technologies.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
The Wood–Armer method is a structural analysis method based on finite element analysis used to design the reinforcement for concrete slabs. [1] This method provides simple equations to design a concrete slab based on the output from a finite element analysis software.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The underside of a waffle slab, showing the grid like structure. A waffle slab or two-way joist slab is a concrete slab made of reinforced concrete with concrete ribs running in two directions on its underside. [1] The name waffle comes from the grid pattern created by the reinforcing ribs.
In civil engineering, concrete leveling is a procedure that attempts to correct an uneven concrete surface by altering the foundation that the surface sits upon. It is a cheaper alternative to having replacement concrete poured and is commonly performed at small businesses and private homes as well as at factories, warehouses, airports and on roads, highways and other infrastructure.
“Mow first, walking back and forth and running the tires of the mower near or over the edge can affect its appearance so it’s best to mow before doing detail work like edging,” Carpenter says.
The precast concrete slab has tubular voids extending the full length of the slab, typically with a diameter equal to the 2/3–3/4 the thickness of the slab. This makes the slab much lighter than a massive solid concrete floor slab of equal thickness or strength. The reduced weight also lowers material and transportation costs.