Search results
Results From The WOW.Com Content Network
A Singapore Tourist Pass may be purchased from S$22 [64] (inclusive of a S$10 refundable card deposit and a 3-day pass) for the payment of public transportation fares. The card may be purchased at selected TransitLink Ticket Offices, LTA Kiosks, Passenger Service Centres and Singapore Visitors Centres, and can be refunded at both TransitLink ...
System Map, including lines under construction. This is a list of all stations on the Mass Rapid Transit (MRT) system in Singapore. [1] As of 2024, the Singapore MRT has approximately 242.6 km (150.7 mi) of system length spread across six operational lines, the 19th highest in the world.
Singapore's MRT infrastructure is built, operated, and managed in accordance with a hybridised quasi-nationalised regulatory framework called the New Rail Financing Framework (NRFF), in which the lines are constructed and the assets owned by the Land Transport Authority, a statutory board of the Government of Singapore.
In 2014, the station will be expanded to four platforms to increase frequency for the Changi Airport branch. On 25 May 2019, it was announced that Tanah Merah station would interchange with the Thomson–East Coast line (TEL) when TEL takes over the Changi Airport branch following its extension to Changi Airport Terminal 5 by 2040.
The Thomson–East Coast Line (TEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore.Coloured brown on the rail map, it is fully underground. When fully completed, the sixth line on the country's MRT network will serve 32 stations around 43 kilometres (27 mi) in length, becoming one of the world's longest driverless rapid transit lines.
The contract for the construction of twin-bored tunnels from Changi Airport station to Changi Airport Terminal 5 was awarded to Shanghai Tunnel Engineering Co (Singapore) Pte Ltd for S$321.7 million (US$240.07 million). [42] [43] Construction required tunnelling under a closed runway east of Terminal 2, which was completed in November 2022. [44]
The Downtown line generally goes in an east–west direction from Bukit Panjang in the northwestern side of Singapore, through the downtown area of Singapore, to Tampines and the Singapore Expo in the east. It is 41.9 kilometres (26.0 mi) long and is entirely underground.
An underground link housing an automated people-mover system and a baggage handling system will be built to connect Terminal 5 with the existing Terminal 2 building 2.5 km away. Aside from future stations on the Thomson-East Coast Line and Cross Island Line , Terminal 5 will also be direct connected to the existing Tanah Merah Ferry Terminal ...