The Y level or wye level is the oldest and bulkiest of the older style optical instruments. A low-powered telescope is placed in a pair of clamp mounts, and the instrument then leveled using a spirit level, which is mounted parallel to the main telescope. The term dumpy level (also builder's level) endures despite the evolution in design. They ...
Large load capacity screw piles may have various components such as flat half helices, Bisalloy cutting tips and helices, cap plates or rebar interfaces for connection to various concrete or steel structures. Most industries use screw piling experts due to the cost efficiencies and, increasingly, the reduced environmental impact.
The drill hole should be 1/2" longer than the depth penetration of the screw. The screw itself should be drilled a minimum of 1" into the concrete to hold effectively and a maximum of 1-3/4" or the threads will wear and will lose holding power. Ideally 1-1/4" to 1-1/2" of screw thread in the concrete. [1] So for example, if a 1/2" board is ...
Tapcon screws are a popular anchor that stands for self tapping (self threading) concrete screw. Larger diameter screws are referred to as LDT's. Larger diameter screws are referred to as LDT's. This type of fastener requires a pre-drilled hole—using a Tapcon drillbit—and are then screwed into the hole using a standard hex or phillips bit .
The anchor selection, together with additional reinforcement, and rigging arrangements is influenced by: - The dead weight of the element - The number of anchors in the element and the configuration of the anchor - Capacity of the anchor at the specific concrete compressive strengths at time of lift - The dynamic loads applied during lifting ...
Grouted tiebacks can be constructed as steel rods drilled through a concrete wall out into the soil or bedrock on the other side. Grout is then pumped under pressure into the tieback anchor holes to increase soil resistance and thereby prevent tiebacks from pulling out, reducing the risk for wall destabilization.