When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Precast concrete - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete

    Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and maneuvered into place; examples include precast beams, and wall panels, floors, roofs, and piles.

  4. Prestressed concrete - Wikipedia

    en.wikipedia.org/wiki/Prestressed_concrete

    Pre-tensioned concrete is a variant of prestressed concrete where the tendons are tensioned prior to the concrete being cast. [1]: 25 The concrete bonds to the tendons as it cures, following which the end-anchoring of the tendons is released, and the tendon tension forces are transferred to the concrete as compression by static friction.

  5. Expansion joint - Wikipedia

    en.wikipedia.org/wiki/Expansion_joint

    They are commonly found between sections of buildings, bridges, sidewalks, railway tracks, piping systems, ships, and other structures. Building faces, concrete slabs, and pipelines expand and contract due to warming and cooling from seasonal variation, or due to other heat sources. Before expansion joint gaps were built into these structures ...

  6. Glossary of prestressed concrete terms - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_prestressed...

    A "active end anchorage of a prestressing tendon that has jacking operations undertaken at that end. [3]: 20 load balancing A prestressed concrete design method in which the prestressing forces exerted upon the member act to balance a given proportion of the service loads that the member will be subjected to. [1]: 38 longitudinal prestressing

  7. JIC fitting - Wikipedia

    en.wikipedia.org/wiki/JIC_fitting

    As with other flared connection systems, the seal is achieved through metal-to-metal contact between the finished surface of the fitting nose and the inside diameter of the flared tubing. The sleeve is used to evenly distribute the compressive forces of the flare nut to the flared end of the tube.

  8. Concrete cone failure - Wikipedia

    en.wikipedia.org/wiki/Concrete_cone_failure

    Under tension loading, the concrete capacity of a single anchor is calculated assuming an inclination between the failure surface and surface of the concrete member of about 35°. The concrete cone failure load N 0 {\displaystyle N_{0}} of a single anchor in uncracked concrete unaffected by edge influences or overlapping cones of neighboring ...

  9. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head