Concrete has a limited lifespan between batching / mixing and curing. This means that ready-mixed concrete should be placed within 30 to 45 minutes of the batching process to hold slump and mix design specifications in the US, [15] though in the UK, environmental and material factors, plus in-transit mixing, allow for up two hours to elapse. [16]
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The design begins by determining the requirements of the concrete. These requirements take into consideration the weather conditions that the concrete will be exposed to in service, and the required design strength. The compressive strength of a concrete is determined by taking standard molded, standard-cured cylinder samples.
F/n = 23 kN per anchor during initial lift (n = 2 lifting anchors) Transport loads in the yard and on-site Suction due to casting bed adhesion is not considered, as the calculation takes into account the lifting device dynamic coefficient. S = (W x Ksl x Kd) / n = (64.8 x 1.16 x 1.2) / 2 = 45.1 kN load resistance required per anchor
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
A wet mix concrete plant combines some or all of the above ingredients (including water) at a central location into a concrete mixer - that is, the concrete is mixed at a single point, and then simply agitated on the way to the jobsite to prevent setting (using agitators or ready mix trucks) or hauled to the jobsite in an open-bodied dump truck ...
Concrete has a very low coefficient of thermal expansion, and as it matures concrete shrinks. All concrete structures will crack to some extent, due to shrinkage and tension. Concrete which is subjected to long-duration forces is prone to creep. The density of concrete varies, but is around 2,400 kilograms per cubic metre (150 lb/cu ft). [1]
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.