When.com Web Search

  1. Including results for

    capacity utilization factor

Search results

  1. Results From The WOW.Com Content Network
  2. Capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Capacity_utilization

    Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [ 1 ]

  3. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    In electrical engineering, utilization factor, , is the ratio of the maximum load which could be drawn to the rated capacity of the system. This is closely related to the concept of Load factor. The Load factor is the ratio of the load that a piece of equipment actually draws (time averaged) when it is in operation to the load it could draw ...

  4. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    Certain onshore wind farms can reach capacity factors of over 60%, for example the 44 MW Eolo plant in Nicaragua had a net generation of 232.132 GWh in 2015, equivalent to a capacity factor of 60.2%, [7] while United States annual capacity factors from 2013 through 2016 range from 32.2% to 34.7%.

  5. Full load hour - Wikipedia

    en.wikipedia.org/wiki/Full_load_hour

    The annual utilisation rate or capacity factor derived from the number of full-load hours is the relative full-load utilisation in a year, i.e. the number of full-load hours divided by 8760 hours, the number of hours in a year with 365 days.

  6. Load duration curve - Wikipedia

    en.wikipedia.org/wiki/Load_duration_curve

    The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity factor. The product of the two is a measure of electrical energy (e.g. kilowatthours).

  7. Energy policy of India - Wikipedia

    en.wikipedia.org/wiki/Energy_policy_of_India

    The capacity utilisation factor is nearly 16% in the fiscal year 2017-18. The Ministry of New and Renewable Energy (MNRE) of India has announced a revised estimation of the potential wind power resource (excluding offshore wind power potential) from 49,130 MW assessed at 50m Hub heights to 102,788 MW assessed at 80m Hub height at 15% capacity ...

  8. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  9. Passenger load factor - Wikipedia

    en.wikipedia.org/wiki/Passenger_load_factor

    Passenger capacity of different transport modes Road space requirements. Passenger load factor, or load factor, measures the capacity utilization of public transport services like airlines, passenger railways, and intercity bus services. It is generally used to assess how efficiently a transport provider fills seats and generates fare revenue.