When.com Web Search

  1. Ads

    related to: special hole filling expanding concrete base kit

Search results

  1. Results From The WOW.Com Content Network
  2. Rubble trench foundation - Wikipedia

    en.wikipedia.org/wiki/Rubble_trench_foundation

    A steel-reinforced concrete grade beam may be poured at the surface to provide ground clearance for the structure. If an insulated slab is to be poured inside the grade beam, then the outer surface of the grade beam and the rubble trench should be insulated with rigid XPS foam board, which must be protected above grade from mechanical and UV ...

  3. Controlled low strength material - Wikipedia

    en.wikipedia.org/wiki/Controlled_low_strength...

    Since flowable fill is normally a comparatively low-strength material, there are no strict quality requirements for fly ash used in flowable fill or controlled low strength material mixtures. Fly ash is well suited for use in flowable fill mixtures. Its fine particle sizing (nonplastic silt) and spherical particle shape enhances mix flowability.

  4. Offshore concrete structure - Wikipedia

    en.wikipedia.org/wiki/Offshore_concrete_structure

    Concrete offshore platforms of the gravity-base type are almost always constructed in their vertical attitude. This allows the inshore installation of deck girders and equipment and the later transport of the whole structure to the installation site. The most common concrete designs are: [citation needed] Condeep (with one, two, three or four ...

  5. Autoclaved aerated concrete - Wikipedia

    en.wikipedia.org/wiki/Autoclaved_aerated_concrete

    Special wall fasteners (screw wall plug anchors) designed for autoclaved aerated concrete including gypsum board and plaster tiles are available at a higher cost than standard expandable wall plugs, including special safety-relevant anchors for high load bearing; [58] [59] [60] It is recommended that fixing holes be drilled using HSS drill bits ...

  6. Hesco bastion - Wikipedia

    en.wikipedia.org/wiki/Hesco_bastion

    Assembling the HESCO unit entails unfolding it and filling it with sand, soil or gravel, usually using a front end loader.The placement of the barrier is generally very similar to the placement of a sandbag barrier or earth berm except that room must generally be allowed for the equipment used to fill the barrier.

  7. Anchor bolt - Wikipedia

    en.wikipedia.org/wiki/Anchor_bolt

    In this case, concrete base material might be undamaged. Pull-out: the anchor is pulled out from the drilled hole partially damaging the surrounding concrete. When the concrete is damaged the failure is also indicated as pull-through. Concrete cone: after reaching the load-bearing capacity a cone shape is formed.