Ad
related to: typical ground floor slab construction
Search results
Results From The WOW.Com Content Network
For a ground-bearing slab, the formwork may consist only of side walls pushed into the ground. For a suspended slab, the formwork is shaped like a tray, often supported by a temporary scaffold until the concrete sets. The formwork is commonly built from wooden planks and boards, plastic, or steel.
A solid ground floor consists of a layer of concrete, which in the case of a domestic building will be the surface layer brought up to ground floor level with hardcore filling under it. The advantage of a solid ground floor is the elimination of dry rot and other problems normally associated with hollow joisted floors.
In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
A ground-level floor can be an earthen floor made of soil, or be solid ground floors made of concrete slab. Ground level slab floors are uncommon in northern latitudes where freezing provides significant structural problems, except in heated interior spaces such as basements or for outdoor unheated structures such as a gazebo or shed where ...
The precast concrete slab has tubular voids extending the full length of the slab, typically with a diameter equal to the 2/3–3/4 the thickness of the slab. This makes the slab much lighter than a massive solid concrete floor slab of equal thickness or strength. The reduced weight also lowers material and transportation costs.
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Beam and block is a construction method to support flooring, especially for ground floors as well as multi story buildings. [1] It is made of cast concrete, one piece of which is a prestressed concrete beam, which can be an inverted T-shaped beam, or lintel, the other piece being a simple rectangular block. [1]