Build–operate–transfer (BOT) or build–own–operate–transfer (BOOT) is a form of project delivery method, usually for large-scale infrastructure projects, wherein a private entity receives a concession from the public sector (or the private sector on rare occasions) to finance, design, construct, own, and operate a facility stated in the concession contract.
Design–build–finance–operate-maintain (DBFOM) [10] [11] also referred to as Design–build–finance–maintain-operate (DBFMO) [12] [13] is a project delivery method very similar to BOOT except that there is no actual ownership transfer. Moreover, the contractor assumes the risk of financing until the end of the contract period.
Pay on production (PoP) is a special build-operate-transfer (BOT) model, where payment is made to a supplier by the original equipment manufacturer (OEM) per piece produced on the supplier's own equipment by the OEM's employees.
This category lists BOT projects around the world. Pages in category "Build–operate–transfer" The following 14 pages are in this category, out of 14 total.
Build–operate–transfer (BOT) Build–operate–transfer represents a complete integration of the project delivery: the same contract governs the design, construction, operations, maintenance, and financing of the project. After some concessionary period, the facility is transferred back to the owner. Build–own–operate–transfer (BOOT)
BOT, BOOT, BOO, BLT, DBFO, DCMF are types of project financing. The hallmarks of project financing are: (i) The lenders to the project look primarily at the earnings of the project as the source from which loan repayments will be made. Their credit assessment is based on the project, not on the creditworthiness of the borrowing entity.
Design–bid–build (or design/bid/build, and abbreviated D–B–B or D/B/B accordingly), also known as Design–tender (or "design/tender"), traditional method, or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.
The project was unique in many respects. It was the first major project in India to be undertaken on a BOT (Build-Operate-Transfer) basis; the organisation structure was different from that of a typical Indian Railway set-up; the project had 93 tunnels along a length of 82 km and involved tunnelling through soft soil.