Ad
related to: 8 step floodplain management process model
Search results
Results From The WOW.Com Content Network
Flood management is a broad term that includes measures to control or mitigate flood waters, such as actions to prevent floods from occurring or to minimize their impacts when they do occur. [4] [5] Flood management methods can be structural or non-structural:
Floodplain restoration is the process of fully or partially restoring a river's floodplain to its original conditions before having been affected by the construction of levees (dikes) and the draining of wetlands and marshes.
Watershed delineation is the process of identifying the boundary of a watershed, also referred to as a catchment, drainage basin, or river basin.It is an important step in many areas of environmental science, engineering, and management, for example to study flooding, aquatic habitat, or water pollution.
Flood Modeller is a computer program developed by Jacobs that assesses flood risk by simulating the flow of water through river channels, urban drainage networks and across floodplains using a range of one- and two-dimensional hydraulic solvers.
Robinson Creek in Boonville, California, had highly eroded stream banks prior to initiation of a stream restoration project.. Stream restoration or river restoration, also sometimes referred to as river reclamation, is work conducted to improve the environmental health of a river or stream, in support of biodiversity, recreation, flood management and/or landscape development.
While flood control aims mainly on reducing or preventing the negative effects of floods, IFM aims on reducing the overall risk by means of land and water resources management with the goal of maximizing the benefits from the use of flood plains and minimizing the damage and loss of life due to flooding in a sustainable manner.
The urban model included a dam break scenario with flood water passing through a residential area. The model was found to have: "The ability to construct a model with elements varying in size to suit the features being modelled permitted flow behaviour to be simulated realistically and at a level of local detail that structured grid models ...
SWMM-CAT is a utility that adds location-specific climate change adjustments to a Storm Water Management Model (SWMM) project file. Adjustments can be applied on a monthly basis to air temperature, evaporation rates, and precipitation, as well as to the 24-hour design storm at different recurrence intervals.