Ads
related to: lumber length calculatorstackct.com has been visited by 10K+ users in the past month
Search results
Results From The WOW.Com Content Network
US Customary. 1⁄12 ft 3. The board foot or board-foot is a unit of measurement for the volume of lumber in the United States and Canada. It equals the volume of a board that is one foot (30.5 cm) in length, one foot (30.5 cm) in width, and one inch (2.54 cm) in thickness, or exactly 2.359 737 216 liters. Board foot can be abbreviated as FBM ...
Re-sawing is the splitting of 1-to-12-inch (25–305 mm) hardwood or softwood lumber into two or more thinner pieces of full-length boards. For example, splitting a 10-foot-long (3.0 m) 2×4 ( 1 + 1 ⁄ 2 by 3 + 1 ⁄ 2 in or 38 by 89 mm) into two 1×4s ( 3 ⁄ 4 by 3 + 1 ⁄ 2 in or 19 by 89 mm) of the same length is considered re-sawing.
Retrieved November 9, 2020. A standard cord is a unit of measure of wood products 4 feet (122 cm) wide, 4 feet (122 cm) high, and 8 feet (244 cm) long, or its equivalent, containing 128 cubic feet (3.6 m3) when the wood is ranked and well stowed. Any voids that will accommodate a stick, log or bolt of average dimensions to those in that pile ...
Engineered lumber can be cut to length and installed much like sawn lumber; the flitch requires shop fabrication and/or field bolting. This, coupled with a much increased self-weight of the beam (11.4 pounds (5.2 kg) for engineered wood vs. 25.2 pounds (11.4 kg) for a flitch beam), decreases the viability of the system.
Shiplap is either rough-sawn 25 mm (1 in) or milled 19 mm ( in) pine or similarly inexpensive wood between 76 and 254 mm (3 and 10 in) wide with a 9.5–12.7 mm (– in) rabbet on opposite sides of each edge. [1] The rabbet allows the boards to overlap in this area. The profile of each board partially overlaps that of the board next to it ...
Cutting stock problem. In operations research, the cutting-stock problem is the problem of cutting standard-sized pieces of stock material, such as paper rolls or sheet metal, into pieces of specified sizes while minimizing material wasted. It is an optimization problem in mathematics that arises from applications in industry.