Construction cost estimating software is computer software designed for contractors to estimate construction costs for a specific project. A cost estimator will typically use estimating software to estimate their bid price for a project, which will ultimately become part of a resulting construction contract.
A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...
In archaeology, spoil is the term used for the soil, dirt and rubble that results from an excavation, and discarded off site on spoil heaps. These heaps are commonly accessed by barrow runs . Spoil management
Construction cost - the total cost to construct a project. This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. This total or subtotal is usually identified as such in an estimate report. Also known as Total Estimated Contract Cost (TECC). [4]
Earth moving equipment (c. 1922) Flattened and leveled construction site. Road roller in the background. Excavation may be classified by type of material: [1]: 13.1 Topsoil excavation; Earth excavation; Rock excavation; Muck excavation – this usually contains excess water and unsuitable soil
Archaeological site of Atapuerca, Spain; Excavation of Olive Mount cutting, Liverpool. Watercolour by T.T.Bury (1833) The cutting was 20 ft (6.1 m) wide and 70 ft (21.3 m) deep. Construction required the removal of 480,000 cubic yards (370,000 m 3) of sandstone. Olive Mount cutting, Liverpool, England; Talerddig cutting, Wales
A spoil tip (also called a boney pile, [1] culm bank, gob pile, waste tip [2] or bing) [3] is a pile built of accumulated spoil – waste material removed during mining. [4] Spoil tips are not formed of slag, but in some areas, such as England and Wales, they are referred to as slag heaps. In Scotland the word bing is used.
The BCIS "Standard Form of Cost Analysis" (SFCA) remained an industry staple, largely unchanged, until the late 2000s. In 2012 the "New Rules of Measurement" for cost management throughout the construction process were accompanied by a modernised version of the SFCA. [1] In 2022, the BCIS was spun out of RICS. [2]