When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Construction costs (biology) - Wikipedia

    en.wikipedia.org/wiki/Construction_costs_(biology)

    The unit of construction costs is g g −1 (g glucose required / g biomass produced). Theoretically, if the biochemical pathways to construct all of the thousands of different compounds of an organism would be known, as well as the concentrations of all those compounds, construction costs could be simply calculated as the product of concentration and construction costs, summed over all ...

  3. Rubble trench foundation - Wikipedia

    en.wikipedia.org/wiki/Rubble_trench_foundation

    To construct a rubble trench foundation a narrow trench is dug down below the frost line. The bottom of the trench would ideally be gently sloped to an outlet. Drainage tile, graded 1":8' to daylight, is then placed at the bottom of the trench in a bed of washed stone protected by filter fabric. The trench is then filled with either screened ...

  4. Soil nailing - Wikipedia

    en.wikipedia.org/wiki/Soil_nailing

    Soil nails were used to stabilize an 18 metres (59 ft) high slope consisting of sandy soil. This method proved to be more cost-effective, while at the same time cut down the construction time when compared to other conventional support methods. [4]: 23 Germany was the next country to investigate soil nailing.

  5. Cut and fill - Wikipedia

    en.wikipedia.org/wiki/Cut_and_fill

    A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...

  6. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  7. Bioswale - Wikipedia

    en.wikipedia.org/wiki/Bioswale

    They consist of a swaled drainage course with gently sloped sides (less than 6%). [2]: 19 Bioswale design is intended to safely maximize the time water spends in the swale, which aids the collection and removal of pollutants, silt and debris. Depending on the site topography, the bioswale channel may be straight or meander.

  8. Trench - Wikipedia

    en.wikipedia.org/wiki/Trench

    A gas main being laid in a trench. A trench is a type of excavation or depression in the ground that is generally deeper than it is wide (as opposed to a swale or a bar ditch), and narrow compared with its length (as opposed to a simple hole or pit).

  9. Glossary of civil engineering - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_civil_engineering

    Also Abrams' water-cement ratio law. A law which states that the strength of a concrete mix is inversely related to the mass ratio of water to cement. As the water content increases, the strength of the concrete decreases. abrasion The process of scuffing, scratching, wearing down, marring, or rubbing away a substance or substrate. It can be intentionally imposed in a controlled process using ...