NLEX Segment 10 (Harbor Link), the second phase of the NLEX Harbor Link project, is a four-lane, 5.65-kilometer (3.51 mi) fully elevated expressway which connects with the Karuhatan Link (Segment 9) in Valenzuela to C-3 Road in Caloocan, where two ramps carry it to the west for another 2.60 kilometers (1.62 mi) up to Radial Road 10 (R-10) in ...
On March 18, 2015, NLEX Segment 9 or the NLEX Karuhatan Link was opened, providing continuation to Segment 8.1 that runs from the other side of the Harbor Link Interchange to MacArthur Highway in Karuhatan, Valenzuela. On February 28, 2019, the main stretch of NLEX Segment 10 or the NLEX Harbor Link, from Karuhatan to C-3 Road, was opened to ...
The Harbor Link Interchange, [1] also known as the Mindanao Interchange and North Luzon Expressway Harbor Link Interchange (NLEX Harbor Link Interchange) and formerly known as the Smart Connect Interchange, is a two-level cloverleaf interchange in Valenzuela, Metro Manila, Philippines which serves as the junction of North Luzon Expressway (NLEX) between its main segment and its Harbor Link ...
President Rodrigo Duterte yesterday led the opening of the North Luzon Expressway (NLEX) Harbor Link Segment 10, a six-lane highway that aims to cut down motorists' travel time. The 5.65-kilometer ...
It connects the NLEX Harbor Link to the Metro Manila Skyway, which connects further to the North and South Luzon Expressways. The highway traverses parallel to the PNR Metro Commuter Line. It has five interchanges, four of which are currently operational. Alongside NLEX Harbor Link, trucks are allowed to use it. [1]
Measuring 2.4-kilometer (1.5 mi) long, it is also the first segment of the NLEX Harbor Link project, which connects the NLEX with the Port of Manila. [7] From the Harbor Link Interchange to a 3-way signalized junction with Mindanao Avenue, C-5 is known as NLEX–Mindanao Avenue Link or NLEX Segment 8.1. The entire 2.7-kilometer (1.7 mi) toll ...
Project Construction Status Operational Ref. Region 3 Central Luzon Link Expressway Phase I 2017–21 Completed July 15, 2021 NCR NLEX Segment 8.2: Proposed NLEX-SLEX Connector Roads: NLEX Connector: 2019–24 Under-construction 4th Quarter of 2024 NLEX Harbor Link (Segment 9 and 10) 2014–20 Completed June 15, 2020 Metro Manila Skyway Stage 3 ...
E5 (NLEX Harbor Link) in Caloocan: Skyway in Santa Mesa, Manila: 2023 Partial operation between Caloocan and Magsaysay Boulevard. Metro Cebu Expressway: 73.7 45.8 Route 81 (Naga–Uling Road) in Naga, Cebu: Route 8 (Cebu North Road) in Danao, Cebu: under construction North Luzon East Expressway: 92.1 57.2 E5 (NLEX Segment 8.2) in Quezon City