IS: 1199 – methods of sampling and analysis of concrete. IS: 516BXB JWJJS– methods of test for strength of concrete. IS: 13311 – ultrasonic testing of concrete structures. IS: 4925 – specifications for concrete batching plant. IS: 3025 – tests on water samples; IS: 4990 – specifications for plywood formwork for concrete.
This is a mobile miniaturized version of the large stationary batch plant. They are used to provide ready mix concrete utilizing a continuous batching process or metered concrete system. The volumetric mobile mixer is a truck that holds sand, rock, cement, water, fiber, and some add mixtures and color depending on how the batch plant is outfitted.
A wet mix concrete plant combines some or all of the above ingredients (including water) at a central location into a concrete mixer - that is, the concrete is mixed at a single point, and then simply agitated on the way to the jobsite to prevent setting (using agitators or ready mix trucks) or hauled to the jobsite in an open-bodied dump truck ...
The concrete slump test measures the consistency of fresh concrete before it sets. It is performed to check the workability of freshly made concrete, and therefore the ease with which concrete flows. It can also be used as an indicator of an improperly mixed batch. The test is popular due to the simplicity of apparatus used and simple procedure.
Volumetric Concrete Mixer A volumetric concrete mixer. A volumetric concrete mixer (also known as volumetric mobile mixer) is a concrete mixer mounted on a truck or trailer that contains separate compartments for sand, stone, cement and water. On arrival at the job site, the machine mixes the materials to produce the exact amount of concrete ...
S88, shorthand for ANSI/ISA88, is a standard addressing batch process control. It is a design philosophy for describing equipment and procedures. It is not a standard for software and is equally applicable to manual processes. It was approved by the ISA in 1995 and updated in 2010. Its original version was adopted by the IEC in 1997 as IEC 61512-1.
The placement consisted of 10,251 cubic yards of concrete placed in 58.5 hours using two concrete pumps and two dedicated concrete batch plants. Upon curing, this placement allows the 50,180-square-foot (4,662 m 2 ) cofferdam to be dewatered approximately 26 feet (7.9 m) below sea level to allow the construction of the Inner Harbor Navigation ...
Concrete mixers generally do not travel far from their plant, as the concrete begins to set as soon as it is in the truck. Many contractors require that the concrete be in place within 90 minutes after loading. Some trucks in dry climates are equipped with the capability of adding water in spray form during the trip, especially on long trips.