When.com Web Search

  1. Ads

    related to: concrete slab construction methods

Search results

  1. Results From The WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    Suspended slab under construction, with the formwork still in place Suspended slab formwork and rebar in place, ready for concrete pour. A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most ...

  4. Concrete - Wikipedia

    en.wikipedia.org/wiki/Concrete

    Reinforced concrete can be precast or cast-in-place (in situ) concrete, and is used in a wide range of applications such as; slab, wall, beam, column, foundation, and frame construction. Reinforcement is generally placed in areas of the concrete that are likely to be subject to tension, such as the lower portion of beams.

  5. Tilt up - Wikipedia

    en.wikipedia.org/wiki/Tilt_up

    Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete. Though it is a cost-effective technique with a shorter completion time, [ 1 ] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.

  6. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4]

  7. Large panel system building - Wikipedia

    en.wikipedia.org/wiki/Large_panel_system_building

    The first German use of large panel system-building construction is what is now known as the Splanemann-Siedlung in Berlin's Lichtenberg district, constructed in 1926–1930. [1] These two- and three-storey apartment houses were assembled of locally cast slabs, inspired by the Dutch Betondorp in Watergraafsmeer, a suburb of Amsterdam.