Ads
related to: how to figure cubic yards of dirtamazon.com has been visited by 1M+ users in the past month
Search results
Results From The WOW.Com Content Network
0.7645549 m 3. Imperial and US customary. 27 ft 3. A cubic yard (symbol yd3) [1] is an Imperial / U.S. customary (non- SI non- metric) unit of volume, used in Canada and the United States. It is defined as the volume of a cube with sides of 1 yard (3 feet, 36 inches, 0.9144 meters) in length.
Drainage equation. A drainage equation is an equation describing the relation between depth and spacing of parallel subsurface drains, depth of the watertable, depth and hydraulic conductivity of the soils. It is used in drainage design. A well known steady-state drainage equation is the Hooghoudt drain spacing equation.
The acre-foot is a non- SI unit of volume equal to about 1,233 m 3 commonly used in the United States in reference to large-scale water resources, such as reservoirs, aqueducts, canals, sewer flow capacity, irrigation water, [1] and river flows. An acre-foot equals approximately an eight-lane swimming pool, 82 ft (25 m) long, 52 ft (16 m) wide ...
In military engineering, earthworks are, more specifically, types of fortifications constructed from soil. Although soil is not very strong, it is cheap enough that huge quantities can be used, generating formidable structures. Examples of older earthwork fortifications include moats, sod walls, motte-and-bailey castles, and hill forts.
Developers have proposed dumping 330,000 cubic yards of dirt atop the old course to bring it above the floodplain — the equivalent of more than 21,000 commercial dump-truck loads.
An embankment is a raised wall, bank or mound made of earth or stones, that are used to hold back water or carry a roadway. A road, railway line, or canal is normally raised onto an embankment made of compacted soil (typically clay or rock-based) to avoid a change in level required by the terrain, the alternatives being either to have an ...
Detroit's Ford Field stadium is filled with more than 500 truckloads of dirt to build a racetrack for the Monster Energy AMA Supercross on Saturday.
During this phase the coal tipples and railroad tracks were removed from downtown Pikeville, a bridge was constructed across the cut, the river was rerouted, and the former riverbed filled. 5,000,000 cubic yards (3,800,000 m 3) of soil was moved to create 240 acres (0.97 km 2) of available land in downtown at a cost of $22,200,000. [5]