Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
A corrugated slab is designed when the concrete is poured into a corrugated steel tray, more commonly called decking. This steel tray improves strength of the slab, and prevents the slab from bending under its own weight. The corrugations run in one direction only. A ribbed slab gives considerably more strength in one direction. This is ...
A finished tilt-up building. Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete.Though it is a cost-effective technique with a shorter completion time, [1] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.
Concrete floor of a parking garage being placed Pouring and smoothing out concrete at Palisades Park in Washington, DC Workability is the ability of a fresh (plastic) concrete mix to fill the form/mold properly with the desired work (pouring, pumping, spreading, tamping, vibration) and without reducing the concrete's quality.
The beam and base method of underpinning is a more technically advanced adaptation of traditional mass concrete underpinning. A reinforced concrete beam is constructed below, above or in replacement of the existing footing. The beam then transfers the load of the building to mass concrete bases, which are constructed at designed strategic ...
The installer will then mount the male side of the clip to the panel (typically 22” lengths). To hang the panels, the installer will drop the panel with the male clip into the female clip on the wall. These pads will appear the same as standard method pads on from head on, but can also be removed from the wall because of the male/female clip.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
This is the concrete pad of the Zeitpyramide. Local donations supplied the materials for the concrete slab for free in early 1993. 1 23 October 1993 First tier The first block placed, and the only block to be placed during the 20th century. 2 15:58, 6 September 2003 First tier The first block to be placed during the 21st century. 3 16:14, 29 ...