When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. 16 Divisions - Wikipedia

    en.wikipedia.org/wiki/16_Divisions

    The 16 Divisions of construction, as defined by the Construction Specifications Institute (CSI)'s MasterFormat, is the most widely used standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. and Canada.

  4. List of roof shapes - Wikipedia

    en.wikipedia.org/wiki/List_of_roof_shapes

    Cross gabled: The result of joining two or more gabled roof sections together, forming a T or L shape for the simplest forms, or any number of more complex shapes. See also roof pitch, crow-stepped, corbie stepped, stepped gable: A gable roof with its end parapet walls below extended slightly upwards and shaped to resemble steps. A-frame

  5. Prestressed concrete - Wikipedia

    en.wikipedia.org/wiki/Prestressed_concrete

    Pre-tensioned concrete is a variant of prestressed concrete where the tendons are tensioned prior to the concrete being cast. [1]: 25 The concrete bonds to the tendons as it cures, following which the end-anchoring of the tendons is released, and the tendon tension forces are transferred to the concrete as compression by static friction.

  6. Curb cut - Wikipedia

    en.wikipedia.org/wiki/Curb_cut

    A curb cut , curb ramp, depressed curb, dropped kerb , pram ramp, or kerb ramp is a solid (usually concrete) ramp graded down from the top surface of a sidewalk to the surface of an adjoining street. It is designed primarily for pedestrian usage and commonly found in urban areas where pedestrian activity is expected.

  7. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    Waffle slabs are preferred for spans greater than 40 feet (12 m), because, for a given mass of concrete, they are much stronger than flat slabs, flat slabs with drop panels, two-way slabs, one-way slabs, and one-way joist slabs. [2] Section of a waffle slab including beam, ribs, and column head

  8. JIC fitting - Wikipedia

    en.wikipedia.org/wiki/JIC_fitting

    As with other flared connection systems, the seal is achieved through metal-to-metal contact between the finished surface of the fitting nose and the inside diameter of the flared tubing. The sleeve is used to evenly distribute the compressive forces of the flare nut to the flared end of the tube.

  9. Glossary of prestressed concrete terms - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_prestressed...

    A "active end anchorage of a prestressing tendon that has jacking operations undertaken at that end. [3]: 20 load balancing A prestressed concrete design method in which the prestressing forces exerted upon the member act to balance a given proportion of the service loads that the member will be subjected to. [1]: 38 longitudinal prestressing