Line-commutated converter (HVDC classic) are made with electronic switches that can only be turned on. Voltage-sourced converters are made with switching devices that can be turned both on and off. Line-commutated converters (LCC) used mercury-arc valves until the 1970s, [6] or thyristors from the 1970s to the present day
When line commutated converters are used, the converter station will require between 40% and 60% of its power rating as reactive power. This can be provided by banks of switched capacitors or by synchronous condensers, or if a suitable power generating station is located close to the static inverter plant, the generators in the power station ...
Long distance HVDC lines carrying hydroelectricity from Canada's Nelson River to this converter station where it is converted to AC for use in southern Manitoba's grid. A high-voltage direct current (HVDC) electric power transmission system uses direct current (DC) for electric power transmission, in contrast with the more common alternating current (AC) transmission systems. [1]
This is one of the lowest ESCR values ever achieved with a line-commutated HVDC converter. McNeill was also the first HVDC station to use three-phase, four-winding converter transformers. The transformers, which are connected to 138 kV on the Alberta side and 230 kV on the Saskatchewan side, are each equipped with a 25 kV tertiary winding (to ...
The HVDC back-to-back facility Shin Shinano uses line-commutated thyristor converters. The station houses two converters, one of which opened in December 1977, [ 1 ] the other in 1992. The original 1977 converter was one of the first thyristor-based HVDC schemes to be put into operation in the world and used oil-insulated, oil-cooled outdoor ...
An electrode line is used in some high-voltage direct-current (HVDC) power transmission systems, to connect the converter stations to distant ground electrodes. Many long-distance HVDC systems use sea or ground return for the DC neutral current since this is considerably cheaper than providing a dedicated metallic return conductor on an ...
Budgeted at €550 million, and completed at a cost of €600m, [3] the NorNed cable is a bipolar HVDC link with a voltage of ±450 kV and a capacity of 700 MW. NorNed is a joint project of the Norwegian transmission system operator Statnett and its Dutch counterpart TenneT. The cable system itself and the two converter stations were produced ...
The Western HVDC Link is a high-voltage direct current (HVDC) undersea electrical link in the United Kingdom, between Hunterston in Western Scotland and Flintshire Bridge (Connah's Quay) in North Wales, routed to the west of the Isle of Man. [2] It has a transmission capacity of 2,250 MW and became fully operational in 2019.