When.com Web Search

  1. Ads

    related to: quantity takeoff vs detailed estimate of volume

Search results

  1. Results From The WOW.Com Content Network
  2. Quantity take-off - Wikipedia

    en.wikipedia.org/wiki/Quantity_take-off

    Quantity take-offs (QTO) are a detailed measurement of materials and labor needed to complete a construction project. They are developed by an estimator during the pre-construction phase. This process includes breaking the project down into smaller and more manageable units that are easier to measure or estimate.

  3. Material take off - Wikipedia

    en.wikipedia.org/wiki/Material_take_off

    A material take off (MTO) is the process of analyzing the drawings and determining all the materials required to accomplish the design. Thereafter, the material take off is used to create a bill of materials (BOM). Procurement and requisition are activities that occur after the bill of materials is complete, distinct from Inspection.

  4. Construction estimating software - Wikipedia

    en.wikipedia.org/wiki/Construction_estimating...

    To prepare the bid, first a cost estimate is prepared to determine the costs and then establish the price(s). This involves reviewing the project's plans and specifications to produce a take-off or quantity survey, which is a listing of all the materials and items of work required for a construction project by the construction documents ...

  5. Glossary of construction cost estimating - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_construction...

    Quantify - see: Take off; Quantity is a property that can exist as a magnitude or multitude. For example 1200 mm or 10 each. Quantity surveyor (QS) is a professional working within the construction industry concerned with building costs, in the U.K. and some other areas. A QS employs standard methods of measurement to develop a bill of quantities.

  6. Bill of quantities - Wikipedia

    en.wikipedia.org/wiki/Bill_of_quantities

    A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.

  7. Volume - Wikipedia

    en.wikipedia.org/wiki/Volume

    Some SI units of volume to scale and approximate corresponding mass of water. To ease calculations, a unit of volume is equal to the volume occupied by a unit cube (with a side length of one). Because the volume occupies three dimensions, if the metre (m) is chosen as a unit of length, the corresponding unit of volume is the cubic metre (m 3).

  8. Volume of fluid method - Wikipedia

    en.wikipedia.org/wiki/Volume_of_fluid_method

    It is a scalar function, defined as the integral of a fluid's characteristic function in the control volume, namely the volume of a computational grid cell. The volume fraction of each fluid is tracked through every cell in the computational grid, while all fluids share a single set of momentum equations, i.e. one for each spatial direction.

  9. Neat volume - Wikipedia

    en.wikipedia.org/wiki/Neat_Volume

    A percentage is typically added to neat volume to estimate loose (i.e. uncompacted) volumes for procurement purposes. With concrete work, neat volume is calculated assuming there is no bowing in the formwork , or, for cast-in-place concrete, that the surfaces in contact with the concrete have no voids or imperfections that would require a ...