Ads
related to: board and batten over drywall wall systems installation
Search results
Results From The WOW.Com Content Network
A building site for a row of riverside apartment blocks in Cambridge. The buildings are being constructed using a systems build with a steel frame and various prefabricated components. The blue plastic on the central building is the vapour barrier for the thermal wall insulation before the exterior cladding has been fixed.
Board-and-batten roofing is a type of board roof with battens covering the gaps between boards on a roof as the roofing material. Board-and-batten is also a synonym for single-wall construction , a method of building with vertical, structural boards, the seams sometimes covered with battens.
Siding or wall cladding is the protective material attached to the exterior side of a wall of a house or other building. Along with the roof, it forms the first line of defense against the elements, most importantly sun, rain/snow, heat and cold, thus creating a stable, more comfortable environment on the interior side.
Lime or gypsum plaster is then applied, typically using a wooden board as the application tool. The applier drags the board upward over the wall, forcing the plaster into the gaps between the lath and leaving a layer on the front the depth of the temporary guides, typically about 1 ⁄ 4 inch (6.4 mm). A helper feeds new plaster onto the board ...
Various sized cuts of 1 ⁄ 2 in (13 mm) drywall with tools for maintenance and installation . Drywall (also called plasterboard, dry lining, [1] wallboard, sheet rock, gib board, gypsum board, buster board, turtles board, slap board, custard board, gypsum panel and gyprock) is a panel made of calcium sulfate dihydrate (), with or without additives, typically extruded between thick sheets of ...
Vertical, metal furring is applied to the wall to create a channel and receive the siding material. In construction, furring (furring strips) are strips of wood or other material applied to a structure to level or raise the surface, to prevent dampness, to make space for insulation, to level and resurface ceilings or walls, [1] or to increase the beam of a wooden ship.
Exterior insulation and finish system (EIFS) is a general class of non-load bearing building cladding systems that provides exterior walls with an insulated, water-resistant, finished surface in an integrated composite material system. EIFS has been in use since the 1960s in North America and was first used on masonry buildings.
More expensive: In comparable settings, the costs of plaster veneer walls is higher than mud-and-tape drywall walls. [2] That is, a skilled tradesman working start to finish at full efficiency can surface mud-and-tape with somewhat less labor than with plaster veneer.