Ads
related to: how to calculate concrete needed for garage floor plans with upstairs
Search results
Results From The WOW.Com Content Network
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Waffle slabs are composed by intricate formwork, and may be more expensive than other types of slabs, but depending on the project and the quantity of concrete needed it may be cheaper to build. There are two types of waffle slab system: One way waffle slab system; Two way waffle slab system
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
A storey plan (the red floor would be the 5th in North American convention, or 4th in the European convention) A storey (Commonwealth English) [1] or story (American English; see spelling differences), [2] is any level part of a building with a floor that could be used by people (for living, work, storage, recreation, etc.).
A solid ground floor consists of a layer of concrete, which in the case of a domestic building will be the surface layer brought up to ground floor level with hardcore filling under it. The advantage of a solid ground floor is the elimination of dry rot and other problems normally associated with hollow joisted floors.
Floor Area ratio is sometimes called floor space ratio (FSR), floor space index (FSI), site ratio or plot ratio. The difference between FAR and FSI is that the first is a ratio, while the latter is an index. Index numbers are values expressed as a percentage of a single base figure. Thus an FAR of 1.5 is translated as an FSI of 150%.
Ad
related to: how to calculate concrete needed for garage floor plans with upstairs