When.com Web Search

  1. Ad

    related to: capacity utilization rate graph formula calculator table

Search results

  1. Results From The WOW.Com Content Network
  2. Capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Capacity_utilization

    Capacity utilization or capacity utilisation is the extent to which a firm or nation employs its installed productive capacity (maximum output of a firm or nation). It is the relationship between output that is produced with the installed equipment, and the potential output which could be produced with it, if capacity was fully used. [ 1 ]

  3. Load duration curve - Wikipedia

    en.wikipedia.org/wiki/Load_duration_curve

    The LDC curve shows the capacity utilization requirements for each increment of load. The height of each slice is a measure of capacity, and the width of each slice is a measure of the utilization rate or capacity factor. The product of the two is a measure of electrical energy (e.g. kilowatthours).

  4. Overall equipment effectiveness - Wikipedia

    en.wikipedia.org/wiki/Overall_equipment...

    The Standard Rate for the part being produced is 40 Units/Hour or 1.5 Minutes/Unit The Work Center produces 242 Total Units during the shift. Note: The basis is Total Units, not Good Units. The Performance metric does not penalize for Quality. Time to Produce Parts = 242 Units * 1.5 Minutes/Unit = 363 Minutes

  5. Kingman's formula - Wikipedia

    en.wikipedia.org/wiki/Kingman's_formula

    Kingman's approximation states: () (+)where () is the mean waiting time, τ is the mean service time (i.e. μ = 1/τ is the service rate), λ is the mean arrival rate, ρ = λ/μ is the utilization, c a is the coefficient of variation for arrivals (that is the standard deviation of arrival times divided by the mean arrival time) and c s is the coefficient of variation for service times.

  6. Full load hour - Wikipedia

    en.wikipedia.org/wiki/Full_load_hour

    Full Load hour is a measure of the degree of utilisation of a technical system. [1] [2] [3] Full load hours refer to the time for which a plant would have to be operated at nominal power in order to convert the same amount of electrical work as the plant has actually converted within a defined period of time, during which breaks in operation or partial load operation can also occur.

  7. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  8. Utilization factor - Wikipedia

    en.wikipedia.org/wiki/Utilization_factor

    Utilization factor (solid line) with blade-to-gas speed ratio. The utilization factor or use factor is the ratio of the time that a piece of equipment is in use to the total time that it could be in use. It is often averaged over time in the definition such that the ratio becomes the amount of energy used divided by the maximum possible to be used.

  9. Intersection capacity utilization - Wikipedia

    en.wikipedia.org/wiki/Intersection_Capacity...

    The ICU method uses the Level of Service concept, in which reports on the amount of reserved capacity or capacity deficit. In order to calculate the Level of Service for the ICU method, the ICU for an intersection must be computed first. [3] ICU can be computed by: ICU = sum(max (tMin, v/si) * CL + tLi) / CL = Intersection Capacity Utilization