Ad
related to: pittsburgh pennysaver location on the map of tennessee county lines
Search results
Results From The WOW.Com Content Network
The highway begins at the Alabama state line in Lincoln County, just north of Hazel Green, Alabama, where it enters the state concurrent with SR 10 and US 431.They then go north through farmland and countryside and have an intersection with SR 275 before going through Park City (where the highway passes by Fayetteville Municipal Airport) and crossing a ridge into Fayetteville.
US 31, US 431 and US 41 and US 41A then go around the Tennessee State Capitol Building and lose US 41A, the Rosa L. Parks name and the Tennessee Parkway designation. US 31, US 431 and US 41 then go over the Cumberland River on the Victory Memorial Bridge. US 31, US 431 and US 41 then have an interchange with I-24.
In Tennessee, U.S. Route 412 (US 412) stretches for 181.93 miles (292.79 km) through the farmland of West Tennessee and the hills of Middle Tennessee, starting at the Missouri state line (on I-155 at the Mississippi River) near Dyersburg and running to an interchange between I-65 and SR 99 in Columbia. [1] [2]
Tennessee State Route 109 in Martha, Tennessee. SR 109 begins in southern Wilson County at an interchange with I-840 and SR 265 (exit 72) near Gladeville. The highway heads north as a four-lane divided highway, concurrent with SR 265, for a few hundred feet before SR 265 splits off and goes west.
Beginning at I-24 and ending at SR 111, the route is a controlled-access highway for approximately 24 miles (39 km). The highway goes north as a narrow four-lane freeway (concurrent with unsigned I-124) through downtown and has interchanges with West Main Street (exit 1), Martin Luther King Boulevard (exits 1A–B; unsigned SR 316), and Fourth Street (exit 1C; unsigned SR 389) before crossing ...
The first section of I-40 in Middle Tennessee to be completed was the 14.5-mile (23.3 km) stretch from SR 96 in Williamson County and US 70S in Bellevue, which opened on November 1, 1962. [ 106 ] [ 107 ] The following day, the 16.5-mile (26.6 km) segment joining SR 56 near Silver Point and US 70N in Cookeville saw its first traffic. [ 108 ]
For premium support please call: 800-290-4726 more ways to reach us
County Location mi km Destinations Notes; Sevier: Great Smoky Mountains National Park: 0.0: 0.0: US 441 south (New Found Gap Road) – Cherokee: Southern terminus at North Carolina state line; southern end of US 441 concurrency: SR 73 Scenic east (Little River Road) – Townsend, Elkmont, Cades Cove: Southern end of SR 73 Scenic concurrency