When.com Web Search

  1. Ads

    related to: calculate cubic yards of dirt

Search results

  1. Results From The WOW.Com Content Network
  2. Pequest Fill - Wikipedia

    en.wikipedia.org/wiki/Pequest_Fill

    The foundation for the Pequest Fill would require 6.625 million cubic yards of fill material. This was far more than could be provided by classic cut-and-fill techniques, which require a relatively even balance between the amount of dirt and rock material that is removed from an area of the right-of-way to provide a cut through a hill and the ...

  3. Cubic yard - Wikipedia

    en.wikipedia.org/wiki/Cubic_yard

    A cubic yard (symbol yd 3) [1] is an Imperial / U.S. customary (non-SI non-metric) unit of volume, used in Canada and the United States. It is defined as the volume of a cube with sides of 1 yard (3 feet , 36 inches , 0.9144 meters ) in length .

  4. Cut (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Cut_(earthworks)

    In civil engineering, a cut or cutting is where soil or rock from a relative rise is removed. Cuts are typically used in road, rail, and canal construction to reduce a route's length and grade. Cut and fill construction uses the spoils from cuts to fill in defiles to create straight routes at steady grades cost-effectively.

  5. Drainage equation - Wikipedia

    en.wikipedia.org/wiki/Drainage_equation

    the soil's hydraulic conductivity (Ka and Kb) by measurements; the depth of the bottom of the aquifer (Di) the design drain spacing (L) can be found from the equation in dependence of the drain depth (Dd) and drain radius (r). Drainage criteria

  6. Roll-off (dumpster) - Wikipedia

    en.wikipedia.org/wiki/Roll-off_(dumpster)

    Roll-off container sizes are determined by the amount of debris they can hold, measured in cubic yards. [2] Container sizes commonly found in the United States include 10, 15, 20, 30, and 40 cubic yards, equivalent to approximately 7.65 m³, 11.47 m³, 15.29 m³, 22.94 m³, and 30.58 m³.

  7. Pikeville Cut-Through - Wikipedia

    en.wikipedia.org/wiki/Pikeville_Cut-Through

    During this phase the coal tipples and railroad tracks were removed from downtown Pikeville, a bridge was constructed across the cut, the river was rerouted, and the former riverbed filled. 5,000,000 cubic yards (3,800,000 m 3) of soil was moved to create 240 acres (0.97 km 2) of available land in downtown at a cost of $22,200,000. [5]

  8. In one night, Rupp Arena will transform from basketball to ...

    www.aol.com/one-night-rupp-arena-transform...

    After a Kentucky women’s basketball game Thursday night, Lexington’s downtown arena will prepare to host professional bull riding the next two days.

  9. Ready-mix concrete - Wikipedia

    en.wikipedia.org/wiki/Ready-mix_concrete

    All aggregates should be of a washed type material with limited amounts of fines or dirt and clay. ... batch and load out one 9–12 cubic yards (6.9–9.2 cubic ...