When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Load factor (electrical) - Wikipedia

    en.wikipedia.org/wiki/Load_factor_(electrical)

    In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...

  3. Factor of safety - Wikipedia

    en.wikipedia.org/wiki/Factor_of_safety

    In engineering, a factor of safety (FoS) or safety factor (SF) expresses how much stronger a system is than it needs to be for an intended load.Safety factors are often calculated using detailed analysis because comprehensive testing is impractical on many projects, such as bridges and buildings, but the structure's ability to carry a load must be determined to a reasonable accuracy.

  4. Cooling load temperature difference calculation method

    en.wikipedia.org/wiki/Cooling_load_temperature...

    The first of the cooling load factors used in this method is the CLTD, or the Cooling Load Temperature Difference. This factor is used to represent the temperature difference between indoor and outdoor air with the inclusion of the heating effects of solar radiation. [1] [5] The second factor is the CLF, or the cooling load factor.

  5. Short circuit ratio (electrical grid) - Wikipedia

    en.wikipedia.org/wiki/Short_circuit_ratio...

    The short circuit ratio (SCR) is an indicator of the strength of a network bus about the rated power of a device and is frequently used as a measure of system strength. A higher SCR value indicates a stronger system, meaning that the impact of disturbances on voltage and other variables will be minimized.

  6. Capacity factor - Wikipedia

    en.wikipedia.org/wiki/Capacity_factor

    At the low range of capacity factors is the photovoltaic power station, which supplies power to the electricity grid from a large-scale photovoltaic system (PV system). An inherent limit to its capacity factor comes from its requirement of daylight, preferably with a sun unobstructed by clouds, smoke or smog, shade from trees and building ...

  7. Load-loss factor - Wikipedia

    en.wikipedia.org/wiki/Load-loss_factor

    Multiple empirical formulae exist that relate the loss factor to the load factor (Dickert et al. in 2009 listed nine [5]). Similarly, the ratio between the average and the peak current is called form coefficient k [ 6 ] or peak responsibility factor k , [ 7 ] its typical value is between 0.2 to 0.8 for distribution networks and 0.8 to 0.95 for ...

  8. What does it take to retire with a comfy $10,000/month in ...

    www.aol.com/finance/does-retire-comfy-10-000...

    Here’s how to ‘load up’ on US real estate in 2025 Ultrarich Americans including Jeff Bezos, Oprah Winfrey grew their net worth by $5.7B a day in 2024 — here’s 1 ‘forever asset’ they ...

  9. Impact (mechanics) - Wikipedia

    en.wikipedia.org/wiki/Impact_(mechanics)

    Road traffic accidents usually involve impact loading, such as when a car hits a traffic bollard, water hydrant or tree, the damage being localized to the impact zone. When vehicles collide, the damage increases with the relative velocity of the vehicles, the damage increasing as the square of the velocity since it is the impact kinetic energy ...