Ads
related to: board and batten over drywall wall vent design
Search results
Results From The WOW.Com Content Network
Lime or gypsum plaster is then applied, typically using a wooden board as the application tool. The applier drags the board upward over the wall, forcing the plaster into the gaps between the lath and leaving a layer on the front the depth of the temporary guides, typically about 1 ⁄ 4 inch (6.4 mm). A helper feeds new plaster onto the board ...
Board-and-batten roofing is a type of board roof with battens covering the gaps between boards on a roof as the roofing material. Board-and-batten is also a synonym for single-wall construction , a method of building with vertical, structural boards, the seams sometimes covered with battens.
Vertical, metal furring is applied to the wall to create a channel and receive the siding material. In construction, furring (furring strips) are strips of wood or other material applied to a structure to level or raise the surface, to prevent dampness, to make space for insulation, to level and resurface ceilings or walls, [1] or to increase the beam of a wooden ship.
Plaster veneer (American English) or plaster skim (British English) is a construction methodology for surfacing interior walls, by applying a thin layer of plaster over a substrate—typically over specially formulated gypsum board base, similar in nature to drywall.
Metal lath and plaster walls can be twice as resistant to fire as drywall, and are capable of achieving a two-hour fire rating with a 2-inch-thick (5.1 cm) assembly. Two inches of plaster and lath can also achieve the same decibel rating as 4 + 7 ⁄ 8 inches (12 cm) of drywall. [15]
A wall sloping in the opposite direction is said to overhang. [3] When used in fortifications it may be called a talus. A batter frame is used to guide the construction of a battered dry stone wall. The term is used with buildings and non-building structures to identify when a wall or element is intentionally built with an inward slope.
Drill holes in wall with hole saw, taking firestops, plumbing pipes, and other obstructions into account. It may be desirable to drill two holes in each wall cavity/joist section, one at the bottom and a second at the top for both verification and top-off. Pump loose fill into wall cavity, gradually pulling the hose up as the cavity fills.
Ducts for air pollution control in a 17000 standard cubic feet per minute regenerative thermal oxidizer (RTO). A round galvanized steel duct connecting to a typical diffuser Fire-resistance rated mechanical shaft with HVAC sheet metal ducting and copper piping, as well as "HOW" (Head-Of-Wall) joint between top of concrete block wall and underside of concrete slab, firestopped with ceramic ...