Formwork is molds into which concrete or similar materials are either precast or cast-in-place. In the context of concrete construction, the falsework supports the shuttering molds. In specialty applications formwork may be permanently incorporated into the final structure, adding insulation or helping reinforce the finished structure.
An engineering drawing is a type of technical drawing that is used to convey information about an object. A common use is to specify the geometry necessary for the construction of a component and is called a detail drawing .
Formwork is used in concrete construction as the frame for a structure in which fresh concrete is poured to then harden and take on the desired shape. [6] Aesthetic of concrete surfaces can be varied with different formwork sheathing (e.g. board shuttering, smooth formwork, form liner, form moulds, filter fleeces). The type of material used to ...
For a ground-bearing slab, the formwork may consist only of side walls pushed into the ground. For a suspended slab, the formwork is shaped like a tray, often supported by a temporary scaffold until the concrete sets. The formwork is commonly built from wooden planks and boards, plastic, or steel.
Engineering drawing practices Y14.24–1999: Types and applications of engineering drawings Y14.3–2003: Multiview and sectional view drawings Y14.31–2008: Undimensioned drawings Y14.36M–1996: Surface texture symbols Y14.38–2007: Abbreviations and acronyms for use on drawings and related documents Y14.4M–1989: Pictorial drawing Y14.41 ...
A structural drawing, a type of engineering drawing, is a plan or set of plans and details for how a building or other structure will be built. Structural drawings are generally prepared by registered professional engineers, and based on information provided by architectural drawings. The structural drawings are primarily concerned with the ...
The construction documents, specifically the technical specifications, require the contractor to submit product data, samples, and shop drawings to the architect and engineer for approval. This is one of the first steps that is taken by the contractor after execution of the construction contract and issuance of the "Notice to Proceed".
The oldest construction drawing is in the Temple of Apollo at Didyma. An unfinished stone wall was etched with the profiles of columns and mouldings, and the wall was never finished so the drawing was not erased: a rare glimpse into the history of working construction drawings. [2]