When.com Web Search

  1. Ads

    related to: geofoam fill costs chart for soil protection plan details pdf

Search results

  1. Results From The WOW.Com Content Network
  2. Geofoam - Wikipedia

    en.wikipedia.org/wiki/Geofoam

    Inert: Geofoam will not break down, so it will not spread into surrounding soils. This means that geofoam will not pollute the surrounding soil. Geofoam can also be dug up and reused. Decreases construction time: Geofoam is quick to install and can be installed during any type of weather, resulting in faster installation time.

  3. Geosynthetics - Wikipedia

    en.wikipedia.org/wiki/Geosynthetics

    Drainage is the equilibrium soil-to-geosynthetic system that allows for adequate liquid flow without soil loss, within the plane of the geosynthetic over a service lifetime compatible with the application under consideration. Geopipe highlights this function, and also geonets, geocomposites and very thick geotextiles.

  4. Fill dirt - Wikipedia

    en.wikipedia.org/wiki/Fill_dirt

    Fill dirt is taken from a location where soil is being removed as a part of leveling an area for construction; it may also contain sand, rocks, and stones, as well as earth. Fill dirt should be as free of organic matter as possible since organic matter will decompose creating pockets of empty space within the fill which could result in settling ...

  5. Geotechnical engineering - Wikipedia

    en.wikipedia.org/wiki/Geotechnical_engineering

    Generally, geotechnical engineers first estimate the magnitude and location of loads to be supported before developing an investigation plan to explore the subsurface and determine the necessary soil parameters through field and lab testing. Following this, they may begin the design of an engineering foundation.

  6. Remediation of contaminated sites with cement - Wikipedia

    en.wikipedia.org/wiki/Remediation_of...

    A 1,300,000-square-foot (120,000 m 2) complex of mixed residential, office, retail and commercial space is being built on 15 acres (61,000 m 2) of former industrial land in downtown Victoria that was contaminated by lead. 10 tonnes of soil was treated with cement, which was mixed into the soil on site simply by using an excavator bucket. The ...

  7. Cut and fill - Wikipedia

    en.wikipedia.org/wiki/Cut_and_fill

    Cut and fill takes material from cut excavations and uses this to make fill sections. It costs resources to excavate material, relocate it, and to compact and otherwise prepare the filled sections. The technique aims to minimise the effort of relocating excavated material while also taking into account other constraints such as maintaining a ...

  8. Human composting is rising in popularity as an earth-friendly ...

    www.aol.com/human-composting-rising-popularity...

    Human composting turns bodies into soil by speeding up “what happens on the forest floor,” according to Tom Harries, CEO of Earth Funeral, the human composting company the Muckenhoupt family ...

  9. Slope stability analysis - Wikipedia

    en.wikipedia.org/wiki/Slope_stability_analysis

    Slope stability analysis is a static or dynamic, analytical or empirical method to evaluate the stability of slopes of soil- and rock-fill dams, embankments, excavated slopes, and natural slopes in soil and rock.