Steel and plywood formwork for poured in place concrete foundation. Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the ...
After the concrete has set the wood may be removed. Formwork can also be permanent, and remain in situ post concrete pour. For large slabs or paths that are poured in sections, this permanent formwork can then also act as isolation joints within concrete slabs to reduce the potential for cracking due to concrete expansion or movement.
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material. [2] Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. [3]
Pouring a Slab-on-grade foundation. A concrete finisher is a skilled tradesperson who works with concrete by placing, finishing, protecting and repairing concrete in engineering and construction projects. [1] [2] Concrete finishers are often responsible for setting the concrete forms, ensuring they have the correct depth and pitch.
Pouring a concrete foundation. The design and the construction of a well-performing foundation must possess some basic requirements: [2] The design and the construction of the foundation is done such that it can sustain as well as transmit the dead and the imposed loads to the soil.
Concrete is poured and reinforced with steel rods. The structure serves as the ground floor of the house and supports everything that sits on it. How does weather affect a house’s foundation?
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.