When.com Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Teesta Low Dam - IV Hydropower Plant - Wikipedia

    en.wikipedia.org/wiki/Teesta_Low_Dam_-_IV...

    The project consists of a 45 m high dam with 4 penstocks of 45 m length and 7 m diameter each. The surface power house with installed capacity of 160 MW houses 4 units of 40 MW capacity each designed to operate under the net rated head of 25.05 M and designed to generate 720 million units in a 90% dependable year with 95% machine availability.

  3. Teesta Water Dispute - Wikipedia

    en.wikipedia.org/wiki/Teesta_Water_Dispute

    The Teesta Low Dam - III highlights the river's role in India-Bangladesh water-sharing disputes, affecting regional energy and security dynamics. The construction of India's Gazoldoba Barrage, upstream of the Tista Barrage in Bangladesh, has significantly impacted water flow and intensified the Teesta Water Dispute between the two nations.

  4. Teesta Low Dam - III Hydropower Plant - Wikipedia

    en.wikipedia.org/wiki/Teesta_Low_Dam_-_III...

    The project consists of a 32 m high dam with 4 penstocks of 44 m length and 7 m diameter each. The surface power house with installed capacity of 132 MW houses 4 units of 33 MW capacity each designed to operate under the net rated head of 21.34 M and designed to generate 594.07 million units in a 90% dependable year with 95% machine availability.

  5. Low-head hydro power - Wikipedia

    en.wikipedia.org/wiki/Low-head_hydro_power

    Low-head dams and weirs do not produce harmful methane. Groynes but also weirs prevent the transport of silt (sediment) downstream to fertilize fields [5] and to move sediment towards the oceans. Low-head hydropower is typically installed close to areas where the energy is needed, preventing the need for large electrical transmission lines.

  6. Cost distance analysis - Wikipedia

    en.wikipedia.org/wiki/Cost_distance_analysis

    The primary data set used in cost distance analysis is the cost raster, sometimes called the cost-of-passage surface, [9] the friction image, [8] the cost-rate field, or cost surface. In most implementations, this is a raster grid , in which the value of each cell represents the cost (i.e., expended resources, such as time, money, or energy) of ...

  7. Water Resources Development Act of 1986 - Wikipedia

    en.wikipedia.org/wiki/Water_Resources...

    The Water Resources Development Act of 1986 (WRDA 1986) is part of Pub. L. 99–662, a series of acts enacted by Congress of the United States on November 17, 1986. [1]WRDA 1986 established cost sharing formulas for the construction of harbors, inland waterway transportation, and flood control projects and established rules therefor.

  8. Proposed dams in the Kaliwa River watershed - Wikipedia

    en.wikipedia.org/wiki/Proposed_Dams_in_the...

    The proposed system was intended to be built in stages, with the approval of Laiban Dam subject to the success of the Kaliwa Low Dam. As a result, only stage one, involving Kaliwa Low Dam its attendant the water supply tunnel, were actually approved for construction during the administration of Benigno Aquino III. [2]

  9. Isimba Hydroelectric Power Station - Wikipedia

    en.wikipedia.org/wiki/Isimba_Hydroelectric_Power...

    In April 2013, Ugandan print media reported that the government of India had extended a credit line worth US$450 million (about UGX:1.1 trillion) for construction of the dam. [19] In July 2013, media reports indicated that the cost of the dam had risen to US$570 million (about UGX:1.4 trillion), funded by a loan from the Export-Import Bank of ...