Search results
Results From The WOW.Com Content Network
A phase-gate process (also referred to as a waterfall process) is a project management technique in which an initiative or project (e.g., new product development, software development, process improvement, business change) is divided into distinct stages or phases, separated by decision points (known as gates).
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
The term Electronic System Level or ESL Design was first defined by Gartner Dataquest, an EDA-industry-analysis firm, on February 1, 2001. [1] It is defined in ESL Design and Verification [ 2 ] as: "the utilization of appropriate abstractions in order to increase comprehension about a system, and to enhance the probability of a successful ...
The Y level or wye level is the oldest and bulkiest of the older style optical instruments. A low-powered telescope is placed in a pair of clamp mounts, and the instrument then leveled using a spirit level, which is mounted parallel to the main telescope. The term dumpy level (also builder's level) endures despite the evolution in design. They ...
The SWEBOK Guide serves as a compendium and guide to the body of knowledge that has been developing and evolving over the past decades. The SWEBOK Guide has been created through cooperation among several professional bodies and members of industry and is published by the IEEE Computer Society ( IEEE ), [ 4 ] from which it can be accessed for free.
A level staff, also called levelling rod, is a graduated wooden or aluminium rod, used with a levelling instrument to determine the difference in height between points or heights of points above a vertical datum. When used for stadiametric rangefinding, the level staff is called a stadia rod.
It is in contrast to the design–bid–build model where the contractor is only brought onboard at the end of the design phase. The model allows the contractor to have an input in the design of the scheme and suggest value engineering changes. Studies have shown that savings of around 10% in construction phase time and 7% in cost are ...
Chaos engineering is the discipline of experimenting on a system in order to build confidence in the system's capability to withstand turbulent conditions in production. [ 1 ] Concept