Search results
Results From The WOW.Com Content Network
System Map, including lines under construction. This is a list of all stations on the Mass Rapid Transit (MRT) system in Singapore. [1] As of 2024, the Singapore MRT has approximately 242.6 km (150.7 mi) of system length spread across six operational lines, the 19th highest in the world.
It currently operates independently from Kim Chuan Depot. Gali Batu Depot is the first MRT depot in Singapore to achieve the certification of Building and Construction Authority (BCA) Green Mark Gold. [143] In August 2014, plans for the East Coast Integrated Depot, the world's first four-in-one train and bus depot were announced.
28 February 2025; 0 days' time () — Hume DT4 — — — 1 (100%) TBD Stage 3 Extension TBD 2026 2.2 km Expo - Sungei Bedok DT35 - DT37 — — — 2 (100%) TBD Stage 2 Extension TBD 2040 TBD Bukit Panjang - Sungei Kadut TBD — TBD TBD TBD TBD Downtown Line total — TBD: Sungei Kadut - Sungei Bedok DT1 - DT37 — TBD TBD 37
Opening by 2035, the station was officially announced alongside Sungei Kadut MRT station on 6 January 2025. [2] With no working name announced, the station is codenamed DE1. It is part of a 4-kilometre extension of the DTL from Bukit Panjang MRT/LRT station, with construction set to begin in the fourth quarter of 2025.
The Downtown Line (DTL) is a medium-capacity Mass Rapid Transit (MRT) line in Singapore. It runs from Bukit Panjang station in the north-west of the country towards Expo station in the east via a loop around the city-centre. Coloured blue on the rail map, the line serves 35 stations, all of which are underground. [2]
The Cross Island Line (CRL) is a high capacity Mass Rapid Transit (MRT) line under development in Singapore. It will run in an east–west direction from Changi to Jurong Industrial Estate via Loyang, Pasir Ris, Hougang, Serangoon North, Ang Mo Kio, Sin Ming, Bukit Timah, Clementi and West Coast.
The SMRT Active Route Map Information System (stylized as STARiS) is a rail travel information system developed in house by communications engineers from SMRT Corporation for its North–South Line and East–West Line (NSEWL) trains in Singapore.
Coloured orange on the rail map, the fully-underground line is approximately 35.5 kilometres (22.1 mi) long with 30 stations. Travelling from one end of the line to the other takes about an hour. The line was the fourth MRT line to be opened on the network, with the first stage, from Bartley to Marymount station, commencing operations on 28 May ...